Project Description

This project included the complete restoration of a shoreline on Loughborough Lake. From permit process to completion, Lakeside was contracted to remove 15 hazardous trees, construct 90 feet of sheet piling and riprap shorewall, and build a steel-frame, cedar-topped dock. The project began with the removal of trees and stumps in the winter of 2012 and reached completion following the construction of a 420 square foot dock in early spring of 2013. The client was pleased with the work and is excited to provide a reference to future customers of Lakeside Marine Contracting.