Project Description

This project included the removal of an old existing crib to construct a custom dock. A new, steel pier was fabricated and delivered onsite for installation on the lakebed. Once secured to the lakebed, beams were placed to create the foundation of the new dock.

A steel substructure was welded to the beams and cedar decking and facer boards were installed.